Sign In | Join Free | My frbiz.com
China Henan Perfect Handling Equipment Co., Ltd. logo
Henan Perfect Handling Equipment Co., Ltd.
To be the innovative and technical top world brand
Active Member

8 Years

Home > Battery Transfer Cart >

Heavy Load Industrial Battery Powered Wagon On Rail Customized 30t

Henan Perfect Handling Equipment Co., Ltd.
Contact Now

Heavy Load Industrial Battery Powered Wagon On Rail Customized 30t

Brand Name : industrial transport wagon on rails

Model Number : industrial transport wagon on rails

Certification : CE ISO SGS

Place of Origin : China(mainland)

MOQ : 1 set

Price : USD 3000~7800 set

Supply Ability : 100 sets month

Delivery Time : 20 work days after received balance payment

Packaging Details : trap and wooden case

Product Name : industrial transport wagon on rails

Capacity : 1-300ton

Application : Industrial Filed

Running speed : 0-20m/min

After-sales Service Provided : Engineers available to service machinery overseas

Contact Now

30t heavy load customized industrial transport wagon on rails powered by battery cart

Preview transfer cart

Our heavy load handing cart for ladle transportation is made up of high temperature bearing materials and special structure. It's powered by battery. The battery is fitted in the inner of the cart. The direct-current machine gets its power from the electric control system, which make the cart to start, stop, move forward and move backward. It could run on straight line, L-form track or curved track. We can also fit hydraulic lifting system if needed.

Heavy Load Industrial Battery Powered Wagon On Rail Customized 30t

Production process
CNC Cutting
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling.
Post weld treatmen
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress.
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint.
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.

Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
.
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will
be tested without load and then with load. After the inspection, the cart will be transported to storage area.
parameter of cart
Model BXC-2t BXC-20t BXC-50t BXC-100t BXC-150t
Rated Load(t) 2 20 50 100 150
Table Size (mm) Length(L) 2000 4000 5500 6500 10000
Width(W) 1500 2200 2500 2800 3000
Height(H) 450 550 650 900 1200
Wheel Base(mm) 1200 2800 4200 4900 7000
Rail Inner Gauge(mm) 1200 1435 1435 200 2000
Wheel Diameter (mm) 270 350 500 600 600
Running Speed (m/min) 0-25 0-20 0-20 0-20 0-18
Motor Power(kw) 1 2.2 5 10 15
Battery Capacity 180 180 330 440 600
Battery Voltage 24 48 48 72 72
Running Time When Full Load 4.32 4 3.3 3.2 2.9
Running Distance for One Charge(km) 6.5 4.8 4 3.8 3.2
Recommended Rail Model P15 P24 P43 QU100 QU100

Product Tags:

Industrial Battery Powered Wagon 30t

      

Battery Powered Wagon On Rail

      

Battery Transfer Cart 20m/min

      
China Heavy Load Industrial Battery Powered Wagon On Rail Customized 30t wholesale

Heavy Load Industrial Battery Powered Wagon On Rail Customized 30t Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Henan Perfect Handling Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)